Works
The construction of a 690-meter-long, Ø 1600 mm diameter HDPE PN4 seawater intake pipeline includes: 5000 m³ of excavation and leveling in the sea, pulling and sinking the pipe to its final position in the sea, installation of the intake chamber at a depth of -27 meters, 3500 m³ of backfilling, and port deepening works.